Skip to main content

Manufacturing Systems 1

Module code: MEU33EM5 · Semester: Semester 2

Themes: Theme 1: Energy; Theme 2: Bioengineering/Manufacturing; Theme 3: Mechanical/Manufacturing

Resources​

Questions by Year​

0 of 2 done · tick papers and add notes as you go

Papers open on tcd.ie (sign in to TCD first).

Topics

  • Planning and control: MRP, MRP II, JIT LO1–3
  • Plant layout and cellular manufacturing LO4–6
  • Quality metrics and standards LO7–9
  • Digitalisation in manufacturing LO10
  • Life cycle analysis and sustainability standards LO11–13
  • Agile project management LO14
Learning outcomes
  1. Describe planning and control strategies such as MRP, MRP II and JIT
  2. Build a materials requirement plan from a bill of materials and master schedule
  3. Assess how costs affect a plan
  4. Link DFM and layout with production planning
  5. Distinguish product and process layouts
  6. Quantify metrics for designing manufacturing cells
  7. Define quality metrics for manufacturing
  8. Understand the role of standards in quality and manufacturing systems
  9. Define quality metrics for advanced manufacturing products
  10. Understand digitalisation in manufacturing
  11. Use life cycle analysis on a product
  12. Make a sustainability infographic
  13. Understand ISO standards on manufacturing sustainability
  14. Scope agile project management for new product introduction

Summarised from the module descriptor, checked November 2026.